GPP:
KB swings: 300 reps @ 16 kg
Sledge hammer lever work
*Correction: I was orignally aiming at 500 swings for the day, but I feel that 300 is enough seeing as I have heavy deads tomorrow.
The sledge work felt great...even though it made me feel like my grip is that of a puss.
No comments:
Post a Comment